Cisco Systems RF Gateway 10 Guía de inicio rápido

Busca en linea o descarga Guía de inicio rápido para Redes Cisco Systems RF Gateway 10. Cisco Systems RF Gateway 10 Getting Started Guide Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
QUICK START GUIDE
Cisco RF Gateway 10
1 Overview
2 Site Preparation
3 Chassis Installation
4 Connecting Cables
5 Powering on the Cisco RF Gateway 10
6 Configuring the Cisco RF Gateway 10 at Startup
7 Troubleshooting
8 Obtaining Documentation and Submitting a Service Request
9 Related Documents
Vista de pagina 0
1 2 3 4 5 6 ... 39 40

Indice de contenidos

Pagina 1 - Cisco RF Gateway 10

QUICK START GUIDECisco RF Gateway 101 Overview2 Site Preparation3 Chassis Installation4 Connecting Cables5 Powering on the Cisco RF Gateway 106 Confi

Pagina 2 - 1 Overview

10 Step 1 Locate the threaded holes on the front sides of the chassis that align with the holes in the rack-mount bracket. Ensure that you hold the fr

Pagina 3

11 To install the rack-mount brackets for a mid-mounted configuration on a Cisco RFGW-10 UEQAM, complete the following steps:Step 1 Locate the threade

Pagina 4 - 2 Site Preparation

12 WarningTo prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains

Pagina 5 - 3 Chassis Installation

13 Figure 8 Positioning the Chassis on the Chassis Installation BracketStep 5 Remove the side chassis installation handles and slide the chassis into

Pagina 6 - Verifying Rack Dimensions

14 Figure 9 Positioning the Chassis on the RackStep 7 Hold the chassis in position against the mounting rails and follow these steps:a. Insert a botto

Pagina 7

15 Figure 10 Securing the Side Rack-Mount BracketsYou can install your Cisco RFGW-10 chassis in a two-post rack (see Two-Post Rack Installation Mid-Mo

Pagina 8

16 Figure 11 Installing the Cisco RFGW-10 in a Two-Post Equipment RackCaution If you are using a two-post rack, secure the rack to the floor surface t

Pagina 9

17 Figure 12 Chassis Installation BracketStep 4 With two people, lift the chassis (partially unloaded) into position between the rack posts and rest i

Pagina 10

18 Recommended Tools and SuppliesTable 2 lists the recommended tools and supplies.Ta b l e 2 Recommended Tools and SuppliesQuantity Description Comme

Pagina 11

19 4 Connecting CablesThis section describes how to do the cabling in the Cisco RFGW-10 UEQAM.Power and Ground ConnectionsEach DC PEM has an earth gr

Pagina 12

2 1 OverviewThe Cisco RF Gateway 10 (RFGW-10) is a Carrier Class Universal Edge Quadrature Amplitude Modulation (UEQAM) platform that offers concurre

Pagina 13

20 Step 1 Connect one end of the RJ-45 crossover cable to the RJ-45 port (labeled CONSOLE) on the supervisor.Step 2 Connect the other end of the cable

Pagina 14 - Fan tray

21 The T-10 TORX driver tool and a 1/4-inch flathead screwdriver are used to remove and install the cable bar clamp on the UCH, and loosen the line ca

Pagina 15

22 Note Do not use shrink tubing with quad-shielded MCX Connectors.Nominal AttenuationTable 4 shows the nominal attenuation for specified cable length

Pagina 16

23 Figure 16 Nominal Attenuation Graph for 75-Ohm Miniature Headend Coaxial CableInstalling the UCH on the Cisco RFGW-10 UEQAM RF Switch CardCaution T

Pagina 17

24 Figure 17 Aligning the UCH with the RF switch card Dense Connector PortsFigure 18 Installing the UCH on the FaceplateStep 5 Repeat steps 1 through

Pagina 18 - Quantity Description Comments

25 Tools and Equipment The tools listed below are designed to help you remove and install the cables in the UCH2. • T-10 TORX driver tool—Removes the

Pagina 19 - 4 Connecting Cables

26 Figure 19 Removing an ESD Cap from a MCX connectorFigure 20 Removing an ESD Cap from an F connectorStep 4 Insert and wiggle the connector into the

Pagina 20 - Management Port

27 Note Make sure the cables are aligned correctly and inserted completely otherwise the slide bar will not close.Step 6 Slide the lock bar close comp

Pagina 21 - Part Numbers

28 5 Powering on the Cisco RF Gateway 10After all network interfaces and coaxial cables are connected, perform a visual check of all connections and

Pagina 22 - Nominal Attenuation

29 Figure 22 DC PEM LEDsNote With both the DC PEMs installed, both need to be operating with breaker switches on and OUTPUT OK LED on. If one PEM is n

Pagina 23

3 Figure 1 Cisco RF Gateway 10 chassis components - Front and Rear View1Universal RF line card slots2Supervisor card slots3LCD/Pushbutton panel4Fan as

Pagina 24 - Lead screw

30 6 Configuring the Cisco RF Gateway 10 at StartupThis section describes how to configure the Cisco RFGW-10 UEQAM the first time.Entering the Initia

Pagina 25 - Installing Cables

31 Configure System Management? [yes/no]: noStep 8 If you want to access the router using SNMP, enter Yes at the prompt:Configure SNMP Network Managem

Pagina 26

32 Switch(config)# ip default-gateway 172.20.52.35Switch(config)# end3d17h: %SYS-5-CONFIG_I: Configured from console by consoleSwitch# show ip routeDe

Pagina 27

33 Note If the enable password and enable secret commands are both set, you must enter the secret password.When you enter either of these password com

Pagina 28 - Verifying Basic System Power

34 7 TroubleshootingThe following section provides troubleshooting tips that you can use to verify your system setup.Before You Call for Technical As

Pagina 29 - Figure 22 DC PEM LEDs

35 8 Obtaining Documentation and Submitting a Service RequestFor information on obtaining documentation, submitting a service request, and gathering

Pagina 30 - System Configuration Dialog

36 9 Related Documents • Cisco RF Gateway 10 Hardware Installation Guidehttp://www.cisco.com/en/US/docs/cable/rf_gateway/installation/guide/rfgw10_h

Pagina 32 - Configuring a Static Route

Americas HeadquartersCisco Systems, Inc.San Jose, CA Asia Pacific HeadquartersCisco Systems (USA) Pte. Ltd.SingaporeEurope HeadquartersCisco Systems I

Pagina 34 - 7 Troubleshooting

4 2 Site PreparationDo not unpack the chassis until you are ready to install it. Keep the chassis in the shipping container to prevent accidental dam

Pagina 36 - 9 Related Documents

5 3 Chassis InstallationThe Cisco RFGW-10 UEQAM is shipped with all ordered (configured) components installed in the chassis. A fully configured Cisc

Pagina 37

6 • Always install the heavier equipment in the lower half of the rack to maintain a low center of gravity to prevent the rack from falling over. •

Pagina 38 - Europe Headquarters

7 Figure 2 Verifying Equipment Rack DimensionsInstalling the Chassis Installation BracketsEach chassis is shipped with two chassis installation bracke

Pagina 39

8 Figure 3 Chassis Installation BracketNote After the chassis is installed and secured to the rack, the chassis installation brackets can be removed f

Pagina 40

9 Caution Ensure that the captive screws are secured tightly prior to loading the handles to prevent injury or damage to the chassis.Figure 4 Attachin

Comentarios a estos manuales

Sin comentarios