
Chapter 5 Maintaining the Router
Removing and Replacing AC and DC Power Subsystem Components
5-34
Cisco XR 12410 Router Installation Guide
OL-13832-01
Step 8 Reconnect the W DC power cables in the following order (Figure 5-20):
a. Ground cables first.
b. Positive cables next.
c. Negative cable last.
d. Repeat steps a, b, and c for the other PDU.
e. Go to Step 9.
Warning
To prevent injury and damage to the equipment, always attach the ground and
source DC power cable lugs to the power shelf terminals in the following order:
(1)
ground to ground, (2) positive (+) to positive (+), (3) negative (–) to
negative (–).
Comentarios a estos manuales