
Chapter 6 Cabling the Line Ports and Completing the Installation
Loading and Activating a Service Control Application
Cisco SCE 2000 4/8xFE Installation and Configuration Guide
OL-7826-05 6-13
To view the current link mode, use the following command:
From the SCE 2000# prompt, type show interface linecard 0 link mode and press
Enter.
To view the current link mappings, use the following command:
From the SCE 2000# prompt, type show interface linecard 0 physically-
connected-links and press
Enter.
Loading and Activating a Service Control Application
The SCE 2000 platform provides the basic functionalities of Service Control analysis and
enforcement. A Service Control solution requires that a Service Control application be loaded into
the platform, to take advantage of the unique SCE platform capabilities.
Loading and activating an application includes the following stages:
• Downloading the application provided as an SLI file to the SCE 2000 disk.
• Activating the application.
• Configuring the application.
The detailed procedure of how to perform these operations is not specified and described in this
manual. For further details, refer to the following documentation:
• Service Control Application for Broadband User Guide
• Service Control Application for Broadband Reference Guide
Comentarios a estos manuales