Cisco Systems 4xGBE Guía de usuario Pagina 50

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 152
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 49
Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
SCE 2000 4xGBE Installation and Configuration Guide
4-14 OL-7824-02
To connect the grounding cable to the chassis grounding connector on the SCE 2000, complete
the following steps:
Step 1 From the enclosed Grounding kit, remove the necessary materials: the grounding cable
(green and yellow colored cable) and pairs of hex nuts and spring washers.
Step 2 On the Rear panel of the SCE 2000, locate the chassis grounding connector (refer to the
appropriate figure for an AC- or DC-powered SCE 2000 below).
Step 3 Attach the grounding cable (green and yellow colored cable), firmly fastening the
(enclosed) hex nuts and spring washers with a #¼” hex wrench (refer to the appropriate
figure for an AC- or DC-powered SCE 2000 below).
The other side of the grounding cable must be connected to the site equivalent of the AC earth.
Figure 4-10: Grounding the Unit (AC)
Vista de pagina 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 151 152

Comentarios a estos manuales

Sin comentarios